News
High quality Guaranteed delivery date
11-29
High quality Guaranteed delivery date
On November 17, at the invitation of PetroChina Jilin Petrochemical Company, a team led by Mr. Zhang participated in the "Mobilization Meeting for Equipment Supply Promotion of Jilin Petrochemical Refining and Chemical Transformation and Upgrading Project." The meeting was divided into two parts: an indoor meeting in the morning and a project site visit in the afternoon. Jilin Chemical also specially invited two directors from the Comprehensive Business Department and Equipment Procurement Department of PetroChina Headquarters to participate in this meeting. Jilin Chemical’s party committee secretary, deputy general manager and leaders of directly affiliated departments such as engineering, design, and procurement management departments attended and spoke. This is a promotion meeting for key projects of the PetroChina system. The headquarters and Jilin Chemical leaders attach great importance to it. More than 40 construction units and suppliers of equipment, instruments and other equipment are invited to attend the meeting. Shengu, Lanshi Heavy Equipment, Daqing Petrochemical Machinery, No. 1 Heavy Industry, Seven Heavy Industry Well-known domestic enterprises such as CNPC 1st Construction and CNPC 6th Construction were present. The meeting mainly focused on "high quality and guaranteed delivery".

This project is the first large-scale petrochemical project approved by the state since the "14th Five-Year Plan", with a total investment of 33.925 billion yuan. It will build 21 new units of 1.2 million tons/year ethylene and other units, and renovate 7 units at the same time. It is planned to be between August and December next year. They meet the conditions for delivery. In the second part of the meeting, the heads of the engineering, design and procurement management departments gave a more detailed explanation of the project operation, drawing confirmation, equipment ordering, arrival and installation. During the meeting, a total of 6 supplier representatives came to the stage to speak. As one of the representatives, Mr. Zhang also came to the stage to make a more detailed report on the progress of more than 120 pieces of ethylene and styrene equipment undertaken by our company. Mr. Zhang said that the number of equipment undertaken by Jilin Chemical Project has set a new high for Jiangguo's equipment of the same scale in the domestic refining and chemical industry. While he feels honored, he is also aware of the great responsibility. Therefore, for such a top-notch project, the company will strive to ensure that the project equipment is delivered on time by increasing space, personnel, machinery and strengthening logistics support.
Quality is the keyword of this meeting. Representatives of the supervision units summarized and analyzed the problems. While analyzing the problems, they notified all the units involved to warn all participating units that while ensuring the construction period, Quality should be put first. The supplier's commitment is written down on paper, which is enough to show that this project promotion meeting is truly a pragmatic meeting.
At the end of the meeting, Secretary Jin of Jilin Chemical Party Committee made a concluding speech. He said that those who came to the meeting were basically led by the top leaders of the enterprises, and they came to participate in the promotion meeting held by Jilin Chemical Industry despite their busy schedule. He expressed his heartfelt thanks to the participants for their attendance. Thank you to all participants and builders present for their hard work. Secretary Jin specifically explained the layout plan of the venue and why there was no rostrum in the venue. Instead, the rostrum was surrounded by square tables on the main platform. This fully reflected the equal relationship between Jilin Chemical and its suppliers, and there should be mutual trust between them. and respect. Secretary Jin mentioned that Jihua people always adhere to the work philosophy of "the beginning is a decisive battle, and the beginning is a sprint," and "Jihua has no winter." This concept was confirmed during the afternoon visit to the installation site. Wherever we went, there was still unmelted snow on the hills behind the project. Everywhere we visited, we listened to the person in charge of each installation explain the scale of the installation, construction progress, etc. For those of us in the South, we feel the chill after standing outdoors for a short time. But even under such extremely cold conditions, Jihua people and builders are still fighting on the front line. The enthusiasm for construction at the site has not diminished. This fighting spirit shows the glory of the old industrial base in Northeast China. Jilin Chemical has set a benchmark in the national petrochemical industry. With their high standards and strict requirements, Jihua people fulfill the original intention of Sinopec people. Here, let us pay tribute to the petrochemical people and the builders of the petrochemical project.
The one-day meeting was fully arranged, efficient and rhythmic. We Jiangguo people must use the strength of the entire factory to work vigorously, skillfully, carefully, and scientifically to overcome all difficulties and ensure that the project equipment is delivered on schedule with high quality.
Previous
Previous